Skip to product information
1 of 7

Hon&Guan 150mm Inline Duct Fan, Smoke Exhaust Ventilator Quiet with EU Plug for Bathroom, Office, Grow Rooms, Factory, and 3D Printer.

Hon&Guan 150mm Inline Duct Fan, Smoke Exhaust Ventilator Quiet with EU Plug for Bathroom, Office, Grow Rooms, Factory, and 3D Printer.

Free US shipping · Arrives in 5–7 business days

Regular price $126.37
Regular price Sale price $126.37
Sale Sold out
Shipping calculated at checkout.
Quantity
"Robust and Durable: Adjustable Muted Tube Fan from Hon&Guan, the body shell is made of ABS material, good hardness, high strength, light weight. In line with scientific and technological achievements and flow dynamics research 8 fan blades, with nmb bearing makes the tube fan operate smoothly and have a long service life." "High Performance: The tube fan is low noise, high efficiency, and waterproof. It operates at 530/410 cubic meters per hour of high air volume, 300/240 Pa of high wind pressure, :2550/1850 RPM of high speed. Smoke exhaust duct fan has two modes to choose from, standard is high quality mode when you get it." "Easy to Install: Inline duct fan has a unique double clamping design, which is very easy to install and saves time for maintenance. It can be connected to a filter, provides a variety of installation methods, so you could choose according to the usage situation." "Multiple Application Environments: Heating and cooling transfer, commercial drying, and air filtration make Seed inline fans used in room plants and vertical farms. Our inline fans can also intake fresh air from outside, exhaust smoke and odors, and are commonly used in greenhouses, hydroponics, workbenches, basements, 3D laser printers, etc." "Comes with screw set. Each inline bathroom fan undergoes strict quality control before delivery. Please do not hesitate to contact us if you have any questions."

18-Month Warranty Included

View full details

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)